SES 10 kW Kit
ALTEK
215,280 ₴
1 / 5SKU 42332
Backup Power Supply System LP BESS ST125-258 with STS 250-KS (Hybrid On/Off-Grid) – is a full-featured industrial-grade energy storage and conversion hybrid complex. Thanks to its configuration with an external static transfer switch STS 250-KS (250 kW), the system is capable of instantly reacting to grid failures and ensuring complete energy independence of facilities.
Applications:
► Critical infrastructure: Reliable uninterruptible power supply for hospitals, data centers, telecom facilities, and strategic enterprises where process interruption is unacceptable.
► Commercial & Industrial (C&I): Protection of sensitive equipment in plants, factories, and shopping malls against voltage sags, operation in peak shaving modes, and full autonomy during blackouts.
► Autonomous energy hubs: Operation paired with large solar power plants and generators to create fully independent autonomous systems.
Key Advantages:
• Instant transition to backup power: The external STS 250-KS module ensures switching between grid and off-grid modes in less than 10 milliseconds. Connected equipment continues to operate without rebooting or faults.
• High switching power: The STS module is rated for a nominal power of 250 kW and a current of up to 380 A, which guarantees stable operation under high industrial loads.
• Liquid cooling and reliability: The main BESS unit is equipped with intelligent liquid thermal control, while the STS module features intelligent air cooling. The total service life of LiFePO4 batteries exceeds 6000 cycles.
• Monitoring flexibility: Support for RS485, CAN, and Ethernet protocols for full integration into the enterprise's general energy management system (EMS).
Dispatch to post branches, parcel lockers, or by courier to your doorstep. All packages are insured for 100% of value. Delivery time: 1–3 business days.
Flexible options: Cash on delivery at Nova Poshta branch or bank transfer invoice (IBAN) for individuals, FOP and companies.